Please use this identifier to cite or link to this item: https://has.hcu.ac.th/jspui/handle/123456789/2478
Full metadata record
DC FieldValueLanguage
dc.contributor.authorสุกัญญา ทองดี-
dc.contributor.authorมาริสสา อินทรเกิด-
dc.contributor.authorSukanya Thongdee-
dc.contributor.authorMarisa Intharakoed-
dc.contributor.otherHuachiew Chalermprakiet University. Faculty of Business Administration. Student of Bachelor of Business Administration.en
dc.contributor.otherHuachiew Chalermprakiet University. Faculty of Business Administrationen
dc.date.accessioned2024-07-14T08:26:54Z-
dc.date.available2024-07-14T08:26:54Z-
dc.date.issued2019-
dc.identifier.urihttps://has.hcu.ac.th/jspui/handle/123456789/2478-
dc.descriptionProceedings of the 7th National and International Conference on "Research to Serve Society", 12 July 2019 at Huachiew Chalermprakiet University, Bangphli District, Samutprakarn, Thailand. p. 912-920.en
dc.description.abstractวัตถุประสงค์ของการศึกษานี้เพื่อศึกษากระบวนการผลิตปั๊มน้ำลดของเสียจากปัญหาหน้าแปลนต่อท่อประปา (Flange) รั่วตามด ลดปริมาณในการซ่อมแซมชิ้นงาน (Rework) ของหน้าแปลนต่อท่อประปาในแต่ละเดือน และต้นทุนในการสั่งซื้อของชิ้นส่วนหน้าแปลนต่อท่อประปาลดลงโดยใช้เทคนิคของเครื่องมือคุณภาพ หรือ 7 Basic QC tools เพื่อหาปัจจัยที่มีผลกระทบต่อการเกิดของเสียวิเคราะห์จากอัตราการซ่อมแซมหน้าแปลนต่อท่อประปารั่วตามดที่เกิดขึ้นในระยะเวลา 5 เดือนที่ผ่านมาพบว่ามีการซ่อมแซมเฉลี่ยร้อยละ 0.16 ต่อเดือน จากหลักการพาเรโตสามารถแบ่งลักษณะของปัญหาที่เกิดการซ่อมแซมโดยทำการเลือกทำการปรับปรุงปัญหาหน้าแปลนต่อท่อประปารั่วตามด จากการวิเคราะห์พบว่ามีเปอร์เซ็นของเสียของชิ้นส่วนหน้าแปลนต่อท่อประปา (Flange) ชนิด 1 นิ้วรั่วตามดโดยรวมเฉลี่ยเท่ากับ 0.10 เปอร์เซ็นต่อเดือนซึ่งสูงกว่าเป้าหมายที่กำหนดไว้คือ 0.05 เปอร์เซ็น งานวิจัยนี้ได้ทำการระดมสมองและใช้แผนผังแสดงเหตุและผลเพื่อหาสาเหตุที่ทำให้เกิดของเสียดังกล่าวพร้อมทั้งหาวิธีการและดำเนินการแก้ไขปัญหาเพื่อลดอัตราของการซ่อมแซมและลดปริมาณของเสียโดยการปรับปรุงกระบวนการผลิตหน้าแปลนต่อท่อประปาจากกระบวนการหล่อเป็นกระบวนการตีขึ้นรูป จากผลการวิจัยพบว่าสามารถทำให้อัตราของการซ่อมแซมหน้าแปลนต่อท่อประปาลดลงจากร้อยละ 0.16 ต่อเดือนเหลือเพียงร้อยละ 0.13 ต่อเดือนและเปอร์เซ็นของเสียของชิ้นส่วนหน้าแปลนต่อท่อประปา (Flange)ชนิด 1 นิ้วโดยรวมลดลงจาก 0.10 เปอร์เซ็นเหลือเพียง 0.03 เปอร์เซ็นและราคาต้นทุนต่อชิ้นลดลงจาก 43 บาทต่อชิ้นเหลือเพียง 33 บาทต่อชิ้นen
dc.description.abstractThe purpose of this study was to reduce waste production, water pumps, water pipes from the flange (Flange), followed by leakage. Reduce the amount of repair work (Rework) of water pipes, flanges each month. And the cost of ordering parts, flanges, pipe fittings, plumbing reduced by using the tool quality or 7 Basic QC tools to determine the factors that affect the incidence of the analysis of foreign repair flanges, pipe fittings, plumbing leaks. followed occurred within 5 months ago found that the average repair rate of 0.16 percent per month from the Pareto principle can be divided nature of the problem repaired by check. Select the update problem flange leaking water pipes under the knife. The analysis found that the percentage of pieces of broken water pipes, flange (Flange) type 1 inch leak, followed by an overall average of 0.10 percent per month, which is higher than the target set is 0.05 percent conducted research and brainstorming, cause and effect diagram to determine the cause of death, such as how to find and implement solutions to reduce the rate of repair and decrease the volume. waste by improving manufacturing processes from the casting process is a process flange forgings. The study found that the rate of repair of the flange pipe water down from 0.16 percent a month to only 0.13 percent per month, and the percentage of broken parts, flanges, pipe fittings, plumbing (Flange), type 1. inches dropped from 0.10 percent to 0.03 percent and cost per part declined from 43 baht to 33 baht per piece, leaving only a piece.en
dc.language.isothen
dc.rightsมหาวิทยาลัยหัวเฉียวเฉลิมพระเกียรติen
dc.subjectการควบคุมความสูญเปล่าen
dc.subjectLoss controlen
dc.subjectการบริหารงานผลิตen
dc.subjectProduction managementen
dc.subjectการเพิ่มผลผลิตทางอุตสาหกรรมen
dc.subjectIndustrial productivityen
dc.subjectเครื่องสูบน้ำen
dc.subjectPumping machineryen
dc.titleการปรับปรุงกระบวนการผลิตเพื่อลดปริมาณของเสียและงานซ่อมแชมในกระบวนการผลิต โดยใช้หลักควบคุมคุณภาพ 7 อย่างen
dc.title.alternativeProcess Improvement for Defect Reduction and Reworks in Manufacturing Process by Using 7 QC Toolen
dc.typeProceeding Documenten
Appears in Collections:Business Administration - Proceeding Document

Files in This Item:
File Description SizeFormat 
Process-Improvement-for-Defect-Reduction.pdf2.31 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.